Anonymous

“And there was one night where it was a few minutes to the time we supposed to be released for the day but the director insisted that we run the scene that was just teched before leave. There clearly wasn’t enough time to do this and everyone was dead tired but our stage manager did not stop it. This scene required a transition into another scene where a multi-hundred pound living room set had to be hung maybe 40-50 feet in the air. Now because everyone was rushing to get this done since we were clearly the out of time for that day’s 10/12, the set piece was not hung properly and almost dropped on a cast member who thankfully had moved out of the way in time.”

Related Post

AnonymousAnonymous

“As a disabled individual, 10/12s and the 6-day work week are an incredible obstacle in my work. Among other things, I am immune-compromised and lack of sleep only makes my

AnonymousAnonymous

“A 10/12 or whatever the tech rehearsal length is easily and normally a 14-16 hour day, and it takes a physical and emotional toll. I’ve had off and on tingling

AnonymousAnonymous

“I was working on a musical during Ramadan. 2 10/12 tech days while fasting. That’s sun up to sun down no eating food or drinking water. Instead of stage management